News

The U.S. Army Corps of Engineers awarded $95.3 million in contracts for the final phase of the New Lock at the Soo project. The New Lock is expected to be completed in 2030 and will be the same ...
The U.S. Army Corps of Engineers has awarded a contract option to Kokosing Alberici Traylor LLC for the final $95.3-million phase of the Soo Locks project in Sault Ste. Marie, Mich.—a nearly $3. ...
TS DOST 2025 Phase 3 Seat Allotment: Steps to check the result Step 1: Visit dost.cgg.gov.in, the official TS DOST website. Step 2: On the homepage, select the "Candidate's Login" tab.
Shares of fuel cell and hydrogen specialist Plug Power (NASDAQ: PLUG) are showing signs of recovering from the dismal performance they put up for most of 2025's first half. The stock is up by ...
Phase two would include the removal of an existing church at 11 E. 32nd St. Phase three would see the removal of the existing facility at 49 E. 32nd St. and a new facility built.
Phase 1 and interim phase 2 data met GSK’s immunogenicity success criteria, the London-based drugmaker said. Yet, GSK has decided to hand off to India’s Bharat for the phase 3 trial.
Note: This story contains spoilers from “Squid Game” Season 3, Episode 3. When “Squid Game” star Kang Ae-sim first read what happens to her character in Season 3, she was shocked.
Equinor Energy AS and partners have made a final investment decision (FID) to proceed with Johan Sverdrup Phase 3 development. Johan Sverdrup lies in the Utsira High area of the North Sea, 160 km ...
The best smart locks in 2025 I just upgraded to a smart lock with built-in video doorbell camera — and it’s a game changer for my home How to save money when buying smart home devices However ...