News

A fter months of anticipation, the Bengaluru Metro’s much-delayed Yellow Line, which connects RV Road to Bommasandra via Electronic City, is now expected to open by August 15, according to top ...
The 19.15 km line will enhance connectivity, passing key points. Currently, three trains will operate at 25-minute intervals, ...
Bengaluru's Namma Metro Yellow Line, an 18.8 km elevated stretch connecting RV Road to Bommasandra, is nearing completion ...
Yellow Line to open in August post safety inspection; BMRCL prepares for launch with limited trains and driverless tech.
Currently, Bengaluru Metro operates 77 km of tracks across the Purple (43.49 km) and Green (33.5 km) lines, supported by a fleet of 57 trains—33 for the Purple and 24 for the Green Line.
Namma metro in Bengaluru is gearing up for a driverless metro train, running along the Yellow line metro (R V Road - Bommasandra) in the Silicon City ...
Namma Metro’s much-awaited Yellow Line, which will connect the tech hub of Electronic City, has faced prolonged delays. However, authorities now indicate that the line could finally become ...
Bengaluru: The long-delayed opening of Namma Metro's Yellow Line has taken a political twist, with the ruling Congress and ...
The much-awaited Bengaluru Yellow Line metro is set to start its operation in December 2023 to provide better transport facilities to commuters. Earlier, the Bangalore Metro Rail Corporation ...
Bengaluru Metro: Work on Yellow Line nearly complete but services won't start any time soon, here's why. A prototype train for the Yellow Line is expected to arrive from China on Thursday ...
Bengaluru metro’s Yellow Line delayed again, services to begin in January 2025 The first batch of trains will be available by November or December 2024.
Bengaluru airport metro works are on track, Phase 2 will be done by 2025: DKS. ... Meanwhile, Namma Metro’s Yellow Line is all set to get its first driverless train, ...