News

Modesto had about 4,000 residents when the current bridge was built for about $110,000. It served from 1917 to 1933 as the ...
Photoillustration of the planned Seventh Street bridge replacement, a 1,238-foot-long, eight-span arched concrete box girder bridge that will carry two lanes of traffic in each direction ...
Moving hot oil across Arctic terrain was an unprecedented challenge following the discovery of America’s largest oil field in 1969 in Prudhoe Bay, Alaska.
The National High-Speed Rail Corporation Limited (NHSRCL) launched the first full-span Pre-Stressed Concrete (PSC) Box Girder in Maharashtra for the Mumbai-Ahmedabad Bullet Train corridor on ...
The National High-Speed Rail Corporation Limited (NHSRCL) on Friday confirmed the successful launch of India’s heaviest concrete girder for the ambitious Mumbai-Ahmedabad bullet train project.
NHSRCL is the implementing agency of the 508-km Mumbai-Ahmedabad bullet train project. Situated approximately one kilometre ...
According to the National High-Speed Rail Corporation Limited (NHSRCL), over 1,000 OHE masts have already been installed, ...
Required Course CEE 5261 - Bridge Analysis and Design Introduction to design and behavior of short and medium span bridges. Topics include aesthetics, preliminary design and layout, design of ...